Developer knowledge centre · 46 guides

Prefab cabin buyer guides.
Decisions, evidence and delivery.

Built around the information a resort developer, architect, contractor or procurement team needs to compare a modular building. Product facts come from the published platform and live project model; approvals and commercial scope are always confirmed for the destination.

Tool

Before you sign: twenty checks

Twenty things that should be in writing before you sign a modular contract. Take it into any quotation conversation — including ours.

Toolkit

Procurement templates

Editable RFQ, tender scorecard, responsibility matrix and submittal register for a comparable modular-building review. No form.

Choose the building

Format selection

Compare room formats by guest use, floor plan, transport state and the amount of work left at the destination.

  1. 02

    Buying glamping pods: what to check before you order

    Most pod listings show a photograph and a price. Here is what decides whether the pod works on your pitch and what it costs to get there.

    7 min
  2. 03

    Container house or modular cabin: which one is your project

    Three different buildings get sold under one word. The differences show up in freight, floor area and how much work is left on site.

    7 min
  3. 10

    Prefab cabin types for resort development: choose by operating brief

    The right cabin is the one that fits the guest, the pitch, the route and the operating plan at the same time. This is the first-pass selection framework.

    9 min
  4. 11

    Volumetric vs panelized modular construction: where the work happens

    Both methods move work off site. The important difference is how much work travels as a finished volume and how much is completed after delivery.

    8 min
  5. 12

    Space capsule vs apple cabin: compare the two signature formats

    Both formats create a visual anchor. They differ in room planning, module strategy and how the route to site affects the delivered scope.

    7 min
  6. 24

    Apple cabin dimensions and floor plans: compare D1, D2 and F2

    Exterior dimensions identify the transport problem. A usable floor plan identifies the hospitality product. Developers need both before selecting an apple cabin.

    10 min
  7. 29

    Expandable container house sizes: what 10FT, 20FT, 30FT and 40FT actually mean

    The size name is only a label. The useful comparison is finished floor area, transport state, wet-area strategy and how much building one 40HQ delivers.

    11 min
  8. 33

    Expandable vs folding container house: compare the box, the room and the site work

    Both formats open quickly. Folding wins unit density; expandable wins floor area per room. The right choice comes from beds, wet areas, freight and the length of use.

    11 min
  9. 36

    Portable rooms for sale: compare the room delivered, not the label

    Portable room can mean a sleeping room, site office, serviced dwelling or storage shell. Define the use first, then compare what the shipment and receiving site must deliver.

    12 min
  10. 38

    Apple cabin vs expandable container house: choose by project role

    Both formats arrive largely factory finished, but they solve different commercial problems. One creates a signature room; the other moves repeatable floor area efficiently.

    11 min
  11. 39

    Apple cabin tiny house: what the name does and does not prove

    Apple cabin tiny house is a useful search term, not a legal classification. The project still needs a defined use, drawing, transport plan and local approval pathway.

    10 min

Build the business case

Developer planning

Structure landed cost, phasing and feasibility without borrowing revenue claims from a manufacturer's brochure.

  1. 01

    Starting a glamping site: the accommodation decisions that set your capital

    We build the cabins, not the business plan. This is the part of starting a site we can speak to with numbers — and the part most guides skip.

    8 min
  2. 08

    The landed-cost model: what a cabin really costs delivered

    The price at the factory gate is only part of what you pay. Here is the full cost structure, from factory to first guest.

    8 min
  3. 09

    Building a feasibility model for modular guest rooms

    Brochures quote returns. Lenders and boards want a model. Here is the structure of one — the lines it needs, and which of them a quotation can actually answer.

    7 min
  4. 13

    Modular hotel room schedule: turn a cabin shortlist into operating inventory

    A room schedule is the bridge between a hotel concept and a cabin quotation. It tells the operator, designer and manufacturer what each key must do before anyone freezes a model.

    11 min
  5. 16

    Phased modular resort development: plan the first keys without blocking the next

    Phasing reduces peak funding only when phase one leaves the services, access, documents and product configuration ready for the next tranche.

    8 min
  6. 20

    Apple cabins for resorts and hotels: a developer planning guide

    An apple cabin can create a signature room, but a hospitality project still has to make it work as inventory: bookable, serviceable, deliverable and repeatable.

    10 min
  7. 23

    Apple cabin price and delivered cost: a complete project budget

    An apple cabin price is useful only when the model, transport method, local work and exclusions are defined. This guide turns a factory quote into a project budget.

    11 min
  8. 27

    Apple cabin resort ROI and feasibility model

    A manufacturer cannot promise your occupancy or room rate. It can help define the delivered key, programme, phasing and technical variables that belong in a defensible model.

    12 min
  9. 30

    Expandable container house price: build the landed cost before comparing quotes

    A factory price answers one narrow question. A reliable project budget follows the unit through packing, freight, import, site work, deployment and handover.

    12 min
  10. 40

    Remote workforce accommodation: plan a camp that can operate

    A remote camp is an operating system, not a delivery count. Beds, sanitation, meals, utilities, maintenance and mobilisation must become ready together.

    13 min

Buy a defined scope

Procurement and contracts

Turn an operating brief into comparable technical offers, controlled interfaces and evidence-linked commercial stages.

  1. 14

    Modular hotel room procurement: from operating brief to signed scope

    A modular room is not bought from a catalogue. It is procured by closing the room, engineering, logistics and responsibility decisions in the right order.

    10 min
  2. 15

    Prefab cabin RFQ template: the information that produces a usable quote

    A good RFQ does not ask for a cabin price. It gives every bidder the same project boundaries and requires every answer in the same columns.

    9 min
  3. 21

    How to evaluate an apple cabin manufacturer or supplier

    The factory photograph is the beginning of supplier review, not the conclusion. A useful evaluation follows the exact cabin from drawing approval to shipment records.

    10 min
  4. 22

    Custom apple cabin specification: what can change and what must stay controlled

    Customization creates value when every option is connected to the room, destination and transport plan. Without a freeze process, it creates scope gaps instead.

    10 min
  5. 34

    Rapid-deployment expandable housing units: a procurement brief for real sites

    Rapid deployment is a system outcome, not a product nickname. The unit, route, site, equipment, utilities, approvals and evidence all have to arrive in the right order.

    13 min
  6. 35

    Expandable container house manufacturer: how to audit the factory behind the quote

    The lowest quotation is easy to compare. The harder and more important task is proving who controls the design, factory, changes, inspection, shipment and warranty behind it.

    13 min
  7. 37

    Modular accommodation units: procure the whole camp, not a stack of rooms

    A camp succeeds as an operating system of rooms, services and logistics. Unit price matters, but capacity, shared buildings, infrastructure and mobilisation decide whether it works.

    13 min
  8. 41

    Modular workforce housing specification: write requirements bidders can price

    A useful specification describes an operating camp and measurable evidence. It does not copy one supplier’s brochure or hide every decision behind ‘standard.’

    14 min
  9. 43

    Modular building responsibility matrix: close the gap between factory and site

    Most modular disputes begin at an interface both parties assumed the other owned. A responsibility matrix turns those assumptions into named work and evidence.

    12 min
  10. 44

    Modular building tender evaluation: score evidence, not brochure claims

    A low compliant price is different from a low incomplete price. The scorecard should expose exclusions, evidence and project risk before commercial ranking is final.

    13 min
  11. 45

    Modular building developer due diligence: verify the project before design freeze

    A modular proposal becomes investable when the room programme, approval path, evidence, delivered cost and factory-to-site responsibilities can be reviewed together.

    15 min

Prepare the destination

Delivery and site

Plan packing, access, foundations, utilities, lifting and installation before the shipment becomes a site problem.

  1. 05

    Container mathematics: how a house fits in 2×40HC

    Shipping decides modular economics. The arithmetic of panels, containers and centre of gravity — from a live project.

    7 min
  2. 06

    Why our installation manual has 170 steps

    One day with a crane is not a plan. What a phase-gated installation sequence looks like, and what it protects you from.

    6 min
  3. 17

    Prefab cabin site readiness: what must be complete before delivery

    A finished cabin can still lose days at the destination. Site readiness is the evidence that the route, support, people and interfaces are ready to receive it.

    9 min
  4. 18

    Foundations, utilities and crane planning for modular cabins

    The factory supplies the building. The destination has to provide a support, service connection and lifting operation that match the same coordinated drawing.

    8 min
  5. 25

    Apple cabin shipping and container loading: D1, D2 and F2 logistics

    The cabin is only one part of the shipment. The controlling logistics document connects factory packing, marine transport, final road access, lifting and site readiness.

    11 min
  6. 26

    Apple cabin foundations, utilities and installation

    A factory-finished cabin still depends on a locally designed support and service package. The fastest installation is the one coordinated before production release.

    11 min
  7. 31

    Expandable house installation: what must be ready before the container arrives

    Opening the unit is the short part. A controlled installation starts with route, ground, supports, lifting, services and hold points already resolved.

    12 min
  8. 46

    Modular cabin maintenance and spare parts: plan the operating years

    A cabin is handed over once and serviced for years. The maintainable product is the one whose components, access and replacement route are documented before occupation.

    12 min

Verify what is being bought

Engineering evidence

Use BOM depth, calculation records, inspections and installation controls to distinguish evidence from a claim.

  1. 04

    What is actually inside a modular cabin BOM

    Most quotations are a lump sum. Here is what a real bill of materials looks like — and why six levels matter.

    6 min
  2. 07

    9,947 code checks: what buyers should actually ask about structure

    You do not need to read AISI S100 — you need the questions that expose an offer built without it.

    5 min
  3. 19

    Factory inspection for modular buildings: what evidence should leave with the shipment

    A factory visit is useful only when it closes defined hold points and produces records that remain usable after the modules are packed.

    9 min
  4. 28

    Apple cabin materials, insulation and HVAC by destination

    A materials list describes components. A project specification connects those components to climate, energy, durability, comfort, maintenance and verifiable records.

    12 min
  5. 32

    Expandable house insulation, weather and HVAC: specify the destination, not a slogan

    Panel thickness is one input. Comfort and durability depend on the complete envelope, opened joints, climate, glazing, services and evidence behind the selected build.

    13 min
  6. 42

    Modular construction drawings: build a submittal register that controls the job

    The drawing set is the handrail between factory and site. A register makes every required decision visible, dated and owned before production starts.

    13 min