Before you sign.Twenty checks. Scope, engineering, transport, site and compliance — the standard an AeroPodHomes contract is written to meet. Use it on any offer on your desk, ours included.
0 / 20 Start ticking Mark every item the offer on your desk already commits to in writing.
Scope and quotation Scope stated line by line Structure, enclosure, interior, services, furniture, packing and documents are each named as included or excluded, so you know exactly what a figure covers. Ours What a figure coversWritten exclusions Everything outside the price is listed before order, so nothing is discovered on site. Ours Written exclusionsMaterials breakdown A materials list exists and can be walked through assembly by assembly against the quotation. Ours Six-level bill of materialsChange-order mechanism There is a defined way to price and record variations once the design is frozen. Ours Written variation ordersTransport and packing Container count stated The number and type of containers is stated for your configuration, not estimated later. Ours 2 × 40 HC, per residenceShippability tested The delivery format was chosen against transport limits — oversize cargo is a decision made early, not discovered late. Ours How the packing is setLoading plan A crate-level loading plan exists and is confirmed against actual weights before dispatch. Ours Container loading planUnload order matches install Containers are packed so the first thing needed on site is the first thing out. Ours Packed in install orderSite and installation Written sequence A numbered installation sequence exists with crew sizes and durations — not a promise that one day with a crane covers it. Ours A 170-step sequenceInspection hold points Named gates require records before work continues, with clear authority to stop. Ours 170 hold pointsResponsibility matrix Foundations, access, crane, utilities and labour are assigned to a named party. Ours Who does whatSite readiness before dispatch The site is confirmed ready before containers sail, so nothing waits at the port. Ours Confirmed before releaseCommercial and compliance Payment tied to milestones Each payment is released against a named milestone and its evidence, not against a calendar date. Ours Three stages, on evidenceDelivery term and risk transfer The delivery term is named, with duties, destination charges and the point where risk passes to you. Ours Term and risk, namedApprovals pathway Who obtains which permit, in what order, is written down before order. Ours Permits sit with youWarranty, spares and handover The contract names warranty scope and duration, spare-part supply, and the drawings, test records and operating information delivered at completion. Ours 5 years structure, 2 years restAeroPodHomes answers all twenty from the project model that runs each delivery. Bring your site brief and we will walk the list against your own project — including the responsibility matrix for approvals, import compliance and local scope.
Start a project brief