Projects · Missouri, United States
Missouri lakeside residences.
A programme of more than thirty rooftop-terrace guest residences above the lake, engineered as one repeatable system and supplied as light-steel panel kits. The local team takes foundations, connections and finishes. Installation is underway in 2026.
The figures on this page describe one residence. Repeating a resolved building is what makes a programme of this size tractable: the same panel kit, the same packing plan and the same installation sequence are issued for every unit.

The residence
A single-storey plan with a rooftop terrace: open living, two bedrooms and three wet rooms inside a 12.19 × 5.91 m footprint. The room schedule below is taken from the project model, not from a brochure.
| Room | Area | Type |
|---|---|---|
| Living / Dining / Kitchen (open plan) | 28.15 m² | Dry |
| Hall / circulation | 6.68 m² | Dry |
| Bathroom 1 (north) | 3.42 m² | Wet room |
| Bathroom 2 (south) | 3.42 m² | Wet room |
| Washing / laundry room | 2.36 m² | Wet room |
| Bedroom 1 (north) | 10.18 m² | Dry |
| Bedroom 2 (south) | 9.96 m² | Dry |
| Internal area | 64.17 m² | 7 rooms · 3 wet |
What the engineering carried
The residence exists as a positioned model before anything is cut. That model is what the panel drawings, the packing plan and the installation manual are generated from, which is why the numbers below are countable rather than descriptive.
- 1,154
- steel members positioned
- 1,426
- connections resolved
- 9,947
- structural checks run
- 19
- openings set out
Structural checks follow AISI S100-16. Destination compliance is confirmed for each project by the appointed engineers of record and the local authority.
How it left the factory
The building was resolved into 69 panels — wall, floor, terrace and truss — each assembled complete with framing, sheathing and bracing before it was inspected, labelled and crated in installation order.
- 69
- panels in the kit
- 2 × 40 HC
- containers to site
- 14
- build phases
- 170
- inspection hold points
How it went up
Because the panels arrive finished, the site sequence is craning and connecting rather than construction. The installation manual issued with this project runs to 170 steps across 14 phases, each with the check that releases the next one.




Visualizations show the approved design. Photographs show verified installation progress on this project.
Scale it to your scheme
The figures above describe one residence. Set how many your site needs.
- 385 m²
- Internal areaAcross the scheme
- 414
- PanelsBuilt complete in the factory
- 12
- 40 HC containersPacked in installation order
- 1,080
- Site connectionsMade by your team
This multiplies one engineered residence; your layout, model mix and site move the totals. Lifting weights, labour and programme come with your own project review.
See how this project is documented
The bill of materials, packing plan, structural check report and installation manual behind this page are walked through during project review.