Equipment plan
Define racks, service aisles, weights, maintenance access and mounting zones.
Technical equipment enclosures
Use factory-built technical shells for edge and compute infrastructure where the enclosure, service entries and equipment interfaces must be coordinated before integration.

Start with the project
A useful review begins with your site and operating needs, then narrows the product and configuration.
Define racks, service aisles, weights, maintenance access and mounting zones.
Coordinate cable routes, cooling interfaces, condensate and external equipment clearances.
Assign civil work, grounding, fire systems, controls, testing and commissioning.
Model references
These are shell formats for project coordination. Power, cooling, racks, fire systems, controls and commissioning are defined by the project integrator and approved engineering package.
Product references
Use each image to discuss a specific part of the configuration and delivery plan.

Use the compact shell to coordinate door positions, service entries, access and external equipment zones.

Frame, panel, floor, openings and lifting interfaces are reviewed before equipment integration.

Equipment, cooling, power, fire protection and controls are coordinated by the project integrator.
Configuration review
Use the quotation and approved drawings to define the product package and local responsibilities.
Review the steel frame, insulated panels, roof, floor and required structural openings.
Locate service-entry plates, grounding points, lifting interfaces and equipment mounting zones.
Coordinate racks, power, cooling, controls, fire systems and maintenance access outside the shell scope.
Define drawing, inspection, packing, site receiving and commissioning responsibilities before order.
Scope boundary
Keep the product package, your project inputs and local site work clear before the order is approved.
Technical-shell format, structural openings, coordination drawings and shell documentation.
Equipment layout, weights, power and cooling concept, interfaces, destination and schedule.
Detailed engineering, equipment, controls, fire systems, testing and commissioning.
Ordering
| Order quantity | Confirmed for the selected format, shipment plan and project phase. |
|---|---|
| Programme | Confirmed after the drawing set, quantity and factory schedule are agreed. |
| How it is quoted | One figure for the agreed scope, with a written exclusions list issued beside it. |
| Payment | Amounts, due points and required release records are defined in the quotation and contract. |
| Inspection | You, or an inspector you appoint, may attend the pre-dispatch inspection or inspect independently, at your cost. |
| Warranty | Periods, included elements, exclusions and claim handling are defined in the project contract. |
Foundations, crane and lifting, utility connections, installation labour and local permits sit with the buyer; engineering, manufacture, inspection, packing and the document set sit with us.
The full landed-cost stack, factory gate to first guest
Before quotation
A useful first review connects the building family to your project conditions, rather than treating selection and site planning as separate decisions.
Common questions
No. The product is a coordinated technical shell. Equipment, power, cooling, fire systems, controls and commissioning require an appointed integrator.
Provide equipment layout, weights, heat-rejection concept, power interfaces, service entries, access needs, destination and target schedule.
The appointed engineering and integration team must define applicable requirements, approve the complete system and manage site testing and commissioning.
Next step
Share location, use, quantity, access and timing.
Request review