Project process
Keep product selection, order information and local site responsibilities connected from the first review onward.
Five connected stages
No two projects share a timeline. These stages exist so scope and handoffs are settled in order — not discovered on site.
Start with use, destination, quantity, site access, utilities and target timing.
Choose the building form before narrowing models, finishes and room layouts.
Separate the product package from approvals, foundations, lifting and local works.
Use the quotation, drawings and configuration list as the shared order record.
Coordinate receiving, access, lifting, temporary storage, foundations and utilities.
The local team follows the staged method statement, with hold points and inspection records at every stage.
Close-out checks, punchlist and the delivered document set complete the project record.
Responsibility clarity
Product-family comparison, available options, configuration inputs, drawings and order information.
Destination, quantity, use, room priorities, approved selections and the target delivery period.
Approvals, civil work, foundations, lifting, final utility connections and site completion.

Before dispatch
Before you sign
Scope, engineering evidence, transport, site responsibilities and handover — the list our project documents are built to answer. Take it into any quotation conversation, including ours.
Next step
Share location, use, quantity, access and timing.