Premium suite · 1 bathroom. Approve furniture, bathroom, storage, openings and terrace interfaces on the plan before production.

Signature Cabin / AP-R35
Arc R35 modular cabin
A landscape suite with a curved weather screen over a repeatable structural platform.Project configuration
Start with the model.
Define it for the destination.
Premium room categories, landscape sites and destination stays.
Glazing, interior zoning, exterior skin, terrace and hospitality equipment package. Structural design, shell joints and export packing are finalized for each project.
Know what is being priced, and what remains on site.
We price from configuration, quantity, destination, finish package, shipping scope and delivery term — never from a picture.
The quotation lists exactly what leaves the factory: structure, enclosure, interior, services, furniture, packing and documents. Anything not listed is local scope.
Your appointed team owns approvals, foundations, access, lifting, final utility connections and site inspections.
Design confirmation, production, inspection, shipping and installation each get their own dates once configuration and destination are fixed.
The contract names the warranty scope, operating documents, maintenance needs, spare parts and your handover contact.
Four decisions connect the cabin model to a buildable project.
- 01Geometry
Confirm full dimension drawings, clear internal heights and opening schedules.
- 02Structure
Define the real load path, chassis, shell support and destination design loads.
- 03Transport
Fix shipping state, module split, route envelope, packing and lifting weight.
- 04Installation
Issue foundations, lifting sequence, module joints, seals, utilities and handover checks.

The engineering behind Arc R35
- Open the engineered model1,154 positioned members and 9,947 structural checks from a live project
- How a cabin fits into 2 × 40 HC containersThe packing study that decides what arrives and in what order
- What a modular cabin costs deliveredThe full landed-cost stack, from factory gate to first guest
- Structural code checks, in buyer termsWhat AISI S100-16 verification actually proves
- Why the installation manual runs to 170 stepsPhase gates, hold points and who can stop the work
- What is inside a modular cabin BOMSix levels, from module down to fastener


