Planning tool · freight movements
Modular building shipping planner.
Convert a mixed room schedule into container and route reviews.
Enter quantities across folding, expandable, apple cabin and capsule formats. The result separates standard 40HQ movements from finished units that need an out-of-gauge route review.
| Format | Quantity | Movement result | Planning note |
|---|
Enter one or more quantities to build the movement table.
What the result does
A visible first pass, not a hidden assumption
The calculation uses only the values entered on this page and the published loading references shown beside the result. It does not select a model, set a price, approve occupancy or replace a project-specific logistics and engineering review.
Review the underlying product referencesPlanning tool questions
Is the container count a booking instruction?
No. It is a first-pass conversion from published loading references. The approved packing list, weights, carrier acceptance and route plan must be confirmed before booking freight.
Why are capsule and some apple cabins separated from containers?
Their published finished widths exceed a standard container door opening. They require an out-of-gauge route review rather than a standard-container count.
Does the result include loose items or spare parts?
No. Furniture, loose components, protection, installation equipment and spares may change the loading plan. Include them in the final packing schedule.
Start a project brief
Add the destination, intended use, quantity and available site information. You can return to the planner when the missing inputs are ready.