Vehicle envelope
Start with the longest, widest and tallest vehicle plus door and circulation clearance.
Folding garages
Plan deployable vehicle storage and workshop space around clear opening width, vehicle height, weather exposure, anchoring and the installation surface.

Start with the project
A useful review begins with your site and operating needs, then narrows the product and configuration.
Start with the longest, widest and tallest vehicle plus door and circulation clearance.
Review wind, rain, snow, ventilation and condensation with the local project team.
Confirm the installation surface, anchoring method, drainage and final access route.
Model references
Reference specifications show a two-bay folding garage format and container-format garage options. Confirm clear opening, internal dimensions, roof form and packed size per order.
Product references
Use each image to discuss a specific part of the configuration and delivery plan.

Use this view to discuss bay width, door clearance and circulation, then confirm the factory drawing.

Roof, doors, side access and optional equipment must be confirmed in the selected configuration.

Frame, hinge and connection details belong in the technical review before delivery and site anchoring.
Configuration review
Use the quotation and approved drawings to define the product package and local responsibilities.
Confirm clear bay width, door type, vehicle height and the space needed to operate each door.
Review roof form, wall panels, ventilation, drainage and insulation needs for the destination.
Define lighting, sockets, side access, storage and workshop needs before the configuration is frozen.
Assign base preparation, anchoring, weatherproofing, final electrical work and local approvals.
Scope boundary
Keep the product package, your project inputs and local site work clear before the order is approved.
Garage format, openings, available options and order drawings.
Vehicle sizes, use, destination, surface, weather exposure and preferred access.
Base design, anchoring, drainage, unloading, final connections and approvals.
Ordering
| Order quantity | Confirmed for the selected format, shipment plan and project phase. |
|---|---|
| Programme | Confirmed after the drawing set, quantity and factory schedule are agreed. |
| How it is quoted | One figure for the agreed scope, with a written exclusions list issued beside it. |
| Payment | Amounts, due points and required release records are defined in the quotation and contract. |
| Inspection | You, or an inspector you appoint, may attend the pre-dispatch inspection or inspect independently, at your cost. |
| Warranty | Periods, included elements, exclusions and claim handling are defined in the project contract. |
Foundations, crane and lifting, utility connections, installation labour and local permits sit with the buyer; engineering, manufacture, inspection, packing and the document set sit with us.
The full landed-cost stack, factory gate to first guest
Before quotation
A useful first review connects the building family to your project conditions, rather than treating selection and site planning as separate decisions.
Common questions
Start with vehicle dimensions, door clearance, circulation, storage and whether the space will also support workshop activity.
These items can be reviewed with the selected format. The quotation and approved drawing must state what is included.
The local team should confirm the base, anchoring, drainage, unloading, final electrical work and any required approvals.
Next step
Share location, use, quantity, access and timing.
Request review